Demolition of the old buildings – A, B and C block – is now well underway after the school moved into a brand new building late 2019.
While some parts, including the swimming pool, will stay, most of the old site will be replaced with new 3G sports pitches.
The college has shared a number of pictures of the work so far on its social media channels including many aerial shots captured by staff member Peter Stoddart using a drone.
While some parts, including the swimming pool, will stay, most of the old site will be replaced with new 3G sports pitches.
2 / 3